Fort Sill
Lawton, Oklahoma
We were awarded ownership and a 50-year contract for the operations and maintenance of the water and wastewater treatment facilities and distribution and collection systems at Fort Sill in Lawton, Oklahoma.
Our responsibilities include system capital investment, regulatory and environmental compliance, planning, asset recapitalization, and long term operations and maintenance. The water and wastewater systems at Fort Sill serve a population of 71,000.
We are using employing innovative ways to maximize efficiency that lead to savings through our optimization of the facilities. Immediate impacts include the optimization of chemical usage that will reduce by half the amount of dried tons of sludge disposed annually. The water system includes over 105 miles of pipe, four pump stations, six storage towers, a booster pumping station, and numerous fire hydrants.
The wastewater utility includes a tertiary treatment facility that on average processes 1.6 million gallons per day (MGD), with a maximum of 4.3 MGD.
STANDARD SPECIFICATIONS
Division 1 - General Requirements
Division 3 - Concrete
Division 5 - Metals
Division 9 - Finishes
Division 22 - Plumbing
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
STANDARD DETAILS
General
Wastewater
Water
DESIGN GUIDE
Military Services Group Design Guide (Jan 2020)
STANDARD SPECIFICATIONS AND DETAILS REVISIONS LOG
2020 Revision Log (current as of Jan 2020)
ADDITIONAL DOCUMENTS
For more information about the Military Services Group Standard Specifications and Details, please contact Preethy Dileepkumar, Senior Engineer, preethy.dileepkumar@amwater.com.
To contact Fort Sill administrator or Project Manager, please email Fort.Sill@amwater.com or contact 580-248-3034.