Fort Leonard Wood
Pulaski County, Missouri
We were awarded ownership and a 50-year contract for the operations and maintenance of the water and wastewater treatment facilities and distribution and collection systems at Fort Leonard Wood, Missouri. FLW is located in Pulaski County and is bordered on the north by the towns of Waynesville and St. Robert, Missouri.
Our responsibilities include system capital investment, regulatory and environmental compliance, planning, asset recapitalization, and long term operations and maintenance.
The primary source of water for the Installation is from Big Piney River. The surface water treatment plant provides approximately 3 million gallons per day (MGD). This is supplemented by 22 groundwater wells. The water system also includes five 500,000-gallon elevated storage tanks, 1.5 million-gallon clear- well, a 170,000-gallon aboveground storage tank, and a 2.25 million-gallon aboveground storage tank.
The average sewage generated and treated at the wastewater treatment plant is 2 MGD. The wastewater collection system includes 55 lift stations.
STANDARD SPECIFICATIONS
Division 1 - General Requirements
Division 3 - Concrete
Division 5 - Metals
Division 9 - Finishes
Division 22 - Plumbing
Division 26 - Electrical
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
STANDARD DETAILS
General
Wastewater
Water
DESIGN GUIDE
Military Services Group Design Guide (Jan 2020)
STANDARD SPECIFICATIONS AND DETAILS REVISIONS LOG
2020 Revision Log (current as of Jan 2020)
ADDITIONAL DOCUMENTS
For more information about the Military Services Group Standard Specifications and Details, please contact Preethy Dileepkumar, Senior Engineer, preethy.dileepkumar@amwater.com.
To contact Ft Leonard Wood administrator or Project Manager, please email Fort.LeonardWood@amwater.com or contact 573-586-4503.